Network Capacity

GenericPipes

We have a five stage process to get your biomethane facility connected to our network.

The first step is to complete our initial network capacity check form, providing some key information
about your project. We’ll produce a free, high level report for you within 15 working days,
identifying available network capacity and the feasibility of your project.

If the initial assessment is encouraging, the next step is to commission a ‘full capacity study’ from us.
This sets out your connection options; the available capacity of the local network under different
conditions (e.g. cold days and warm days); proposed pipeline route; plant and equipment and
indicative costs for the project. We can talk through this report with you, as the content can be quite
technical.